Skip to content Skip to footer

Our client called us after he had hired an individual that was unable to take up existing floor in a timely manner. We came in took up the remaining floor, threw down floor level and installed the engineered wood in 4 days. The previous individual had been taking up floor for a week.

ClientResidential - CondoDateMarch, 2020Floor InstallerMartin TorresShare

Flooring Materials

Flooring was provided by the client 3/8ths engineered wood that was installed over a concrete slab using adhesive